Kueyen + FORS2 activities 22.01.2000
====================================
Commissioning Leader:	R. Amestica
Telescope Operator:	N. Hurtado
Day/Night Astronomers:	-/G. Rupprecht
FORS2 Comm2 Team:	I. Appenzeller, W. Gaessler, W. Hummel, 
			K.-H. Mantel, B. Muschielok, H. Nicklas, 
			W. Seifert, E. Sutorius, K. Tarantik
=============================================================

Night Summary
=============
no observations

Conditions
----------
gen:		cirrus
seeing:		DIMM between 0.9 and 1.6"
wind:		0-10m/s
humid:		70%
temperature:	11C
loss:		all night

Technical Problems
------------------
problem:	none
loss:		-

Other Problems
--------------
TCS still does not know about new installation of FORS2. This will be fixed
by first received PRESET. This is a software configuration feature
that does not introduce any problem but at the same time does not look
nice.

General Comments
----------------
first night of Comm2. Bad weather conditions (high humidity) made
no possible any testing on sky.

************************
Daytime Setup Activities
************************
Fiera:		updated to OCT99 release. OCT98 kept in spare disk.
Setups:		CCD cryostat mounted after decontamination 
		some slit masks mounted
Dewar refill:	yes

Other day- and nighttime activities:
- aligned CCD
- measured focus offset for V_BESS 
- images with SIEB masks
- measured slit parallelizm
- problems:
  - exposure shutter did not open during exposure (2x)
  - wheel 3 failed during setup of V_BESS from free opening (3x)
  - very often the exposure shutter is not closed at beginning of the
    readout (e.g. image focus_V_SR.8.fits, only for small pinhole????)
    check the last focus... images!


FORS2 start-up procedure
------------------------
started:     LT
finished:    LT
by:          

********************
Daytime Calibrations
********************

FORS2 contamination flats
-------------------------
no

comments: to be started as soon as possible to monitor CCD condition
after decontamination 


***********************************
Preparation for the night
***********************************

started:   UT
dome open: UT
handover:  UT


**********************
FORS2 Calibration Plan
**********************
Skyflats 
--------
none


**************************
Commissioning Observations
**************************
none


**********************
FORS2 Calibration Plan
**********************
sky flatfields	- morning
-------------------------
no


Telescope in:    zenith
Dome in:         park
FORS2 in:        calibration position



********************
Daytime Calibrations
********************
FORS2 calibration plan: Biases
------------------------------
no


************
Action Items
************
- improve weather


********************************************************************